18.7.201 |
PURPOSE OF UTILITY OCCUPANCY REGULATIONS |
|
5/12/1995 |
18.7.202 |
DEFINITIONS |
|
12/11/2021 |
18.7.203 |
SCOPE AND APPLICATION |
|
9/9/2023 |
18.7.204 |
OCCUPANCY OF FULL CONTROLLED-ACCESS FACILITY RIGHT-OF-WAY |
|
9/9/2023 |
18.7.205 |
SUPERSEDED REGULATIONS AND PERMITS |
REP
|
9/9/2023 |
18.7.206 |
PRIVATE AND PUBLIC UTILITIES – RELOCATION COSTS |
|
12/11/2021 |
18.7.207 |
ELECTRONIC UTILITY PERMIT APPLICATION PROCESS |
|
9/9/2023 |
|
Rules 18.7.208 through 18.7.210 reserved
|
|
|
18.7.211 |
AREAS OF COMMON USE AND OWNERSHIP |
|
5/12/1995 |
|
Rules 18.7.212 through 18.7.218 reserved
|
|
|
18.7.219 |
ELIGIBLE PROJECTS FOR LONGITUDINAL INTERSTATE USE |
|
9/9/2023 |
18.7.220 |
NON-REGULATED TELECOMMUNICATIONS - FIBER OPTIC – BROADBAND – WIRELESS FACILITIES IN NON-INTERSTATE HIGHWAYS |
|
9/9/2023 |
18.7.221 |
STANDARDS AND PROCEDURES |
REP
|
9/9/2023 |
18.7.222 |
LONGITUDINAL OCCUPANCY OF HIGHWAY RIGHT-OF-WAY BY NEW FACILITIES - GENERAL |
|
5/12/1995 |
18.7.223 |
LONGITUDINAL OCCUPANCY BY NEW OVERHEAD FACILITIES |
|
5/12/1995 |
18.7.224 |
LONGITUDINAL OCCUPANCY BY NEW UNDERGROUND FACILITIES |
|
5/12/1995 |
18.7.225 |
LONGITUDINAL OCCUPANCY OF HIGHWAY RIGHT-OF-WAY BY EXISTING FACILITIES |
|
12/31/1972 |
18.7.226 |
AERIAL CROSSINGS BY NEW UTILITY FACILITIES |
|
5/12/1995 |
18.7.227 |
UNDERGROUND CROSSINGS BY NEW COMMUNICATION AND ELECTRIC POWER FACILITIES |
|
5/12/1995 |
18.7.228 |
UNDERGROUND CROSSINGS BY NEW NATURAL GAS, WATER, SEWER AND HYDROCARBON PIPELINE FACILITIES |
|
12/31/1972 |
18.7.229 |
UNDERGROUND CROSSING METHODS |
|
5/12/1995 |
18.7.230 |
ATTACHMENT TO HIGHWAY STRUCTURES |
|
5/12/1995 |
18.7.231 |
GENERAL CONSIDERATIONS |
|
5/12/1995 |
18.7.232 |
PROCEDURE - NEW UTILITY FACILITIES ON HIGHWAY RIGHT-OF-WAY |
REP
|
1/1/2020 |
|
Rules 18.7.233 through 18.7.240 reserved
|
|
|
18.7.241 |
FORMS |
REP
|
5/12/1995 |