Unless the
context requires and clearly states otherwise, in these rules:
(1) "Act" means the Montana Dam
Safety Act, Title 85, Chapter 15, MCA.
(2) "Breach flooded area" means
the area downstream from a dam that would be inundated if the dam failed.
(3) "Commence construction" means
the actual start of site preparation and on-site building, but does not
include preliminary surveying work, site exploration, or engineering plans
preparation.
(4) "Construction permit" means a
written authorization issued by the department giving the owner authorization
to construct a dam or reservoir in accordance with conditions that ensure
construction of the dam and reservoir in a thorough, secure, and substantial
manner.
(5) "Corps" means United States army corps of engineers.
(6) "Dam" means any artificial barrier, including appurtenant works, used to impound or divert water with an
impounding capacity of 50 acre-feet or greater measured to the crest of
the dam embankment.
(7) "Days" means calendar days--including Sundays and holidays. If the final day is a holiday, or weekend, it shall be
the next following day of business.
(8) "Department" means the department of natural RESOURCES AND CONSERVATION and any of its employees,
agents, or designees authorized by the director of the department to act on
behalf of the department.
(9) "Emergency procedures and warning plan" means a predetermined plan of action to be taken to reduce the
potential for property damage and loss of lives in an area affected by a dam
break.
(10) "Existing dam or reservoir" means any dam or reservoir 50 acre-feet or greater complete and capable
of impounding water prior to October 1, 1985, or under construction on that
date and completed with reasonable diligence.
(11) "Height of dam" means the vertical distance from the lowest elevation of the dam crest to the lowest
point of natural ground, including any stream channel, along the downstream toe
of the dam.
(12) "High-hazard corps-inspected dam" means a dam that was determined to be high-hazard by the corps
of engineers pursuant to P.L. 92-367 and for which a resultant dam safety
report has been submitted to the owner.
(13) "Inundation" means water,
regardless of depth, over the general level of the submerged ground adjacent to
and including the stream channel.
(14) "Loss of life" means loss of
human life.
(15) "New dam" or "new
reservoir" means a dam or reservoir where initial construction occurs
after October 1, 1985.
(16) "Operating permit" means a
permit issued by the department for a period not to exceed 5 years to operate a
high-hazard dam or reservoir.
(17) "Operation plan" means the
written instructions prepared by the owner that prescribe the proper operation
procedures, maintenance procedures, emergency procedures, and warning plan, and
any other features necessary to the safe operation of the dam or reservoir.
(18) "Permit" means construction
or operation permit.